Easy to use, ready-mixed. Just add water.
- Dig a hole to the correct depth and width for the post.
- Fill the hole up to a third of the depth with water and place post in the hole.
- Pour in postmix evenly around the post until no standing water is visable.
- Position and level post and tamp down.
Coverage:
Coverage depends on the size of the hole, but for 100mm x 100mm posts we recommend between 1 and 2 bags per post.